School Site (Temporary/ Permanent) | Permanent |
Distance Between two sites of the School (In KM) | 0 |
Purpose For two sites of the School | N/A |
The School will not run any branch in the previous plot with same Affiliation No. | Yes |
Certifying that no Other institution (Apart From School) is running in the clamed Land area. | No |
Does the school has a pucca Boundary wall? | Yes |
Whether School Has Single Contiguous Plot | Yes |
Number of Building Blocks of School | 3 |
How Many rooms Less than 400 SQ Ft. | 11 |
How many rooms Between 400 to 500 SQ Ft. | 26 |
How Many Rooms Grater Than 500 SQ. Ft. | 5 |
Total Number of Rooms | 42 |
Does the school have a strong Room | yes |
Total Number of Computers (All Computer Labs Combined | 25 |
Total Number of Digital Smart ( Computer Assisted Learning Class) Classrooms. | |
Number of Auditoriums | 0 |
Total Number of Libraries. | 1 |
Total Number of Laboratories. | 7 |
Number of Water Purifiers IRO.s Available in School | 2 |
Total Number of Canteens | 0 |
Total Number of Lifts/ Elevators | 0 |
Does the School Have Sports Facilities | Yes |
Does the school have a Swimming Pool ? | No |
Does the School Have a Gymnasium ? | No |
Does the School Have Dance/ Music Facility? | Yes |
Does the School have a Web Server. | No |
Provision of web based learning programs | Yes |
Does the school have ramps for physically Handicapped ? | No |
Total Number of Toilets | 35 |
Total Number of Boys Toilets | 18 |
Total Number of Girls Toilets | 12 |
Number of Toilets for differently Abled Persons. | 0 |
Total Number of Washrooms for Female Staff | 2 |
Total Number of Washrooms for Male Staff | 3 |
Are the health and hygiene toilets on all floors separate toilets for staff, Ramps, Signboards, etc. Being Maintained properly ? | Yes |
Total Number of Female Rest Rooms. | 1 |
Total Number of Male Rest Rooms. | 1 |
Are CCTV Camera Installed in areas of Security Safety? | No |
Are Sufficient Number of Guards Employed For Safety? | Yes |
Total Number of Buses owned by School | 3 |
Total Number of Buses Hired by School | 0 |
Total Area Of School in Square Meters. | 6151 |
Library Size (In SQ Meters) | 138 |
Computer Lab Size (IN SQ Meters) | 67 |
Composite Science Lab Size (In SQ Meters) | 46 |
Chemistry Lab Size (IN SQ Meters) | 67 |
Physics Lab Size (In SQ Meters) | 74 |
Biology Lab Size ( In SQ Meters) | 67 |
Mathematics Lab Size (IN SQ Meters) | 46 |
| |